Commercial and occupied buildings

Commercial rendering in Scarborough

Commercial rendering uses the same render systems as houses, but on bigger, taller or busier buildings: guesthouses and hotels, shops with flats above, blocks of flats and new-build commercial units. The render itself is familiar. What changes is access, the rules that apply to larger buildings, and keeping the building in use while the façade is done.

Rendered low-rise commercial premises with dark aluminium windows
On this page

Tall façades and access

Scarborough's design guide describes four- and five-storey stone and white-render terraces on South Cliff's main streets and three- and four-storey terraces facing the sea at North Bay. Rendering a frontage like that is a scaffold project first. Where scaffold stands on the pavement, the scaffolding company registers with North Yorkshire Council, applies for a licence with at least seven days' notice and normally keeps it on the footway; licences run for up to four weeks and are then extended.

Big façades also change how the render goes on. Thin coats and scraped monocouche have to be finished face by face without a break, so a wide frontage needs enough people on each lift to keep a wet edge, with planned stops at bead lines, string courses or other features. Sheeting the scaffold keeps wind and rain off fresh work on an exposed front.

Rendering a commercial or new-build façade
  1. Background and drawings Blockwork, board or existing façade checked against the specification.
  2. Set-out Beads, movement joints and bay breaks marked from the drawings.
  3. Basecoat and mesh Mesh across board joints, openings and changes of background.
  4. Finish in bays Each bay is finished in one go so day-joints do not show.
  5. Inspection and handover Hold points and the installed products are recorded.

The usual order of work. The survey and the chosen products decide the actual steps.

New build and refurbishment

On new blockwork, a through-coloured monocouche or a base coat with a silicone finish is the usual choice. The render follows the building: beads at every opening and corner, expansion beads where the structure needs movement joints, mesh at opening heads and render stopped above the damp-proof course on a bellcast bead. Each product sets its own curing period for new masonry and base coats, so check it against the build programme.

Refurbishing an older commercial building starts with the existing finish: tap-testing every elevation from the scaffold, opening trial areas, and deciding wall by wall between repair, overcoating and stripping. Older stone and brick frontages may need lime rather than cement, and changes affecting a listed building’s special interest need listed building consent. For a building in a conservation area, ask the planning authority which permissions and any Article 4 restrictions apply to the proposed work.

Insulated façades and fire safety

If the project adds external wall insulation, fire safety becomes part of the specification. Approved Document B says that where a building with a residential use has a storey 11m or more above ground, insulation in the external wall should be class A2-s1, d0 or better. Where a building containing flats, a hotel or a boarding house has a storey of 18m or more, regulation 7(2) requires every material in the external wall to reach A2-s1, d0 or A1.

For a building of any height, the guidance asks designers to consider how the choice and arrangement of wall materials could spread fire. That is a design responsibility, so ask who has checked the system's classification for your building and its height before boards are ordered.

Keeping a guesthouse or shop open

A building in use needs the work split into stages that keep entrances, fire exits and deliveries usable. Common arrangements are a covered walkway or protection fan over the entrance, working one elevation at a time, and taking noisy hacking-off away from the busiest days. For a guesthouse, rooms behind sheeted scaffold lose light and views, which affects what can honestly be offered to guests.

Signs, lights, CCTV, alarm boxes and cables come off the wall before rendering and often need another trade to refix them. List them for each elevation so nothing is left hanging when the scaffold comes down.

  1. Survey and tap-test every elevation from access

  2. Scaffold licence and protection for the public route

  3. Strip or prepare one elevation or phase at a time

  4. Apply the system face by face, keeping wet edges

  5. Refix signs, lights and services

  6. Inspect high-level details before the scaffold is struck

Handover and maintenance

Before the scaffold comes down, inspect the top of the building: copings, junctions under cornices and parapets, and the sills on upper floors. Ask for photographs of each, with product names, colour references and batch numbers for every elevation. The building manager then has what is needed for future repairs, and the next contractor knows which system is where.

K Rend's maintenance advice for its finishes is light cleaning after a few years, algae treated with a biocide and a low-pressure wash, and stainless steel brackets for anything fixed to the façade. On a sea-front building, add a check of gutters and outlets at least once a year, because blocked rainwater fittings concentrate water on one area of wall.

Common questions

Does a guesthouse count as residential for fire rules?

It can. Approved Document B lists hotels and boarding houses among the residential buildings covered by its external wall rules. The designer should confirm which provisions apply for the building's use and height.

Can the work be done in winter to avoid the busy season?

Partly. Stripping and repairs are less weather-dependent, but most render coats need temperatures of at least 5°C and dry conditions, so finishing may have to wait for suitable weather.

Related advice

More about this work

All articles ↗

Yorkshire and nearby areas

Additional locations

Find rendering information for Scarborough and the following nearby places. Call with your postcode to discuss the work.

View the local area guide ↗